|
|
|
|
|
|
Thyssenkrupp Nirosta equips cold rolling mill with new acid recovery system
Jun 25, 2009
Thyssenkrupp Nirosta upgraded their Krefeld cold mill with a regeneration system to recycle the spent mixed acid from the annealing and pickling lines. "This process delivers numerous benefits to the environment and our production operations and is also more cost-efficient," says Michael Fitzek, environmental officer at ThyssenKrupp Nirosta. The acid recovery system started operation in April and will reach full optimization in the summer.
In the production process at Thyssenkrupp Nirosta, the scale on the surface of the annealed stainless steel is removed in a pickling process using a mixture of hydrofluoric and nitric acid. Over time, the pickling liquor becomes less effective and the spent acid has to be regularly replaced by fresh acid. Previously, the spent acid was neutralized using lime milk, the resultant sludge compacted and sent to landfill, and the waste water fed to the sewer system. The new regeneration system now allows valuable substances, such as metals and regenerated mixed acid to be recovered in a thermally driven process and to be fed back into the pickling process. "That turns the line into a closed circuit," says Gunther Hartmann, responsible project manager at ThyssenKrupp Nirosta. "The new recycling system allows us to make substantial savings, which are urgently needed in the current situation."
This method of acid recovery delivers advantages in many areas: Lower volumes of waste water with reduced nitrogen content mean lower pollution. Less acid and sludge needs to be transported, and the spent acid regeneration system contributes to reduce lime consumption.
In addition, make sure to read these articles:
ThyssenKrupp Europe to modernize hot-strip mill in Duisburg-Beeckerwerth, Germany
ThyssenKrupp Steel Europe to modernize hot strip rolling mill in Duisburg-Bruckhausen, Germany
ThyssenKrupp Steel, Germany, to invest in hot strip production
ThyssenKrupp Metal Forming: Sale contract signed with Gestamp
Stainless steel from Germany for the “One World Trade Center”
Thyssenkrupp Metal Forming to be sold to Gestamp, Spain
Official startup of ThyssenKrupp Steel, Alabama, USA
ThyssenKrupp Steel Europe in Duisburg, Germany, to modernize continuous slab caster
Second blast furnace fired up at ThyssenKrupp CSA in Brazil
First slabs from Brazil arrive at Duisburg, Germany
|
top of page
back
Tell a friend
print
read times
© 2009 GRIPS Intermedia GmbH All rights reserved. Reproduction in whole or in part without permission is prohibited.
|
|
All external sites will open in a new browser.
GRIPS media does not endorse external sites.
|
|