feedback
receive newsletter
login

Follow STEEL GRIPS online on Twitter



STEEL GRIPS online
ISSN 1866-8453


Last updated:
________________
Sep 3, 2010
 
 
Search STEEL GRIPS

         from P&S > Europe  
Plate mill scheduling and plate nesting at ArcelorMittal Asturias, Spain
Jul 16, 2008
As part of a major expansion project on the heavy plate mill of Avilés, ArcelorMittal Asturias selected the AIS solution to improve scheduling and plate nesting.

BetaPlanner, the module for rolling mill scheduling optimization, will be implemented to increase the efficiency of the plate mill. Another SteelPlanner module, PIANO - Plate Intelligent Assignment and Nesting Optimization, will manage the assignment and nesting of customer plates in mother slabs.

PIANO automatically generates cutting plans for combinations of customer plates and assigns those combinations to existing mother (and daughter) slabs from a stockyard. It handles the nesting of customer plates into mother plates, the nesting of those mother plates into existing slabs, as well as the scheduling of those slabs for the cutting table.

On top of the plate nesting optimization, this module will also help to generate the slab requirement for both the local continuous caster (already scheduled with AIS’s AlphaPlanner solution) and from other ArcelorMittal steel plants.

The sequence in which the daughter slabs will be processed by the mill will be solved by the BetaPlanner, considering an extensive number of technological and logistical constraints. the software will also care for the cadence of the two normalizing furnaces.

"This project contributes and supports our strategic goal of de-bottlenecking, increasing production capacity up to 800 Kt/a, as determined by ArcelorMittal Global Plate Organization" says Jean-Pierre Mullié, manager of Flat Rolling of ArcelorMittal Asturias.

The project started in Q1 2008 after a comprehensive selection process and will be taken live in the Q4 2008.


In addition, make sure to read these articles:
read also New air separating unit for ArcelorMittal Gent, Belgium
read also New blast furnace for ArcelorMittal Monlevade, Brazil
read also Personnel changes at ArcelorMittal
read also ArcelorMittal plans rebar JV in Northern Iraq
read also ArcelorMittal South Africa to upgrade electric arc furnace equipment
read also Industeel, Belgium, orders cold plate leveler
read also ArcelorMittal crane operator credited with averting disaster
read also ArcelorMittal denies intention to sell Brazilian assets
read also Dofasco, Canada, to idle EAF for three months
read also Output cuts at ArcelorMittal, capacity-use below 65%
toptop of page   back back   send this news to a friend Tell a friend    printerfriendly page print   read read times   Bookmark and Share

© 2008 GRIPS media GmbH All rights reserved. Reproduction in whole or in part without permission is prohibited.
 
 
no external All external sites will open in a new browser.
GRIPS media does not endorse external sites.