feedback
receive newsletter
login




STEEL GRIPS online
ISSN 1866-8453


Last updated:
________________
May 10, 2012
 
Homepage Steel-Grips 
Search STEEL GRIPS

         from P&S > Americas  
Stainless steel production starts at ThyssenKrupp Stainless USA in Alabama
Oct 7, 2010
ThyssenKrupp's new stainless steel mill in the US state of Alabama has gone into operation. Production has begun with one cold rolling mill.

Cold-rolled capacity is initially 100,000 metric tons a year and will increase over time to a maximum 140,000 tons a year. The material now being produced is 64 inches wide (roughly 160 cm). Various units have gone into operation to produce and further process the cold-rolled strip, including a Sendzimir mill, a cold-rolled annealing and pickling line, a skin pass stand as well as finishing equipment such as coil polishing, slitting and cut-to-length lines. "Three very challenging years are behind us. The start of production marks a key milestone. I am proud of our team, who has mastered this complex project so successfully in a difficult economic environment," says Dr. Ulrich Albrecht-Früh, CEO of ThyssenKrupp Stainless USA. "For our customers it represents an important signal. They can now source their material directly from our new state-of-the-art mill and can find people here who can deal with their specific requirements e. g. sizes, something we couldn't offer economically in the USA before."

Work on building the new site to produce carbon and stainless steel flat products began in 2007 in partnership with ThyssenKrupp Steel USA. The capital investment for the integrated stainless mill in Calvert is around 1.4 billion US dollars. In preparation for the hot commissioning of the stainless equipment, the first white coils were shipped to the USA by ThyssenKrupp Nirosta in June 2010. Following startup, production on the cold rolling mill is now being ramped up step by step using material supplied from ThyssenKrupp's stainless mills in Europe.

Construction of the other units is either planned or in progress. For example, the foundation works for the hot-rolled annealing and pickling line began in January 2010, with startup scheduled for fall 2011. The equipment in place and still to be built will give ThyssenKrupp Stainless USA a unique selling proposition with the widest material available on the US market. The construction and ramp-up of the remaining units is being kept flexible. This also applies to the startup of the melt shop.


In addition, make sure to read these articles:
read also ThyssenKrupp Nirosta to extend production range
read also ThyssenKrupp Europe to modernize hot-strip mill in Duisburg-Beeckerwerth, Germany
read also ThyssenKrupp Steel Europe to modernize hot strip rolling mill in Duisburg-Bruckhausen, Germany
read also ThyssenKrupp Steel, Germany, to invest in hot strip production
read also ThyssenKrupp Metal Forming: Sale contract signed with Gestamp
read also Stainless steel from Germany for the “One World Trade Center”
read also Thyssenkrupp Metal Forming to be sold to Gestamp, Spain
read also Official startup of ThyssenKrupp Steel, Alabama, USA
read also ThyssenKrupp Steel Europe in Duisburg, Germany, to modernize continuous slab caster
read also Second blast furnace fired up at ThyssenKrupp CSA in Brazil

toptop of page   back back   send this news to a friend Tell a friend    printerfriendly page print   read read times  

© 2010 GRIPS Intermedia GmbH All rights reserved. Reproduction in whole or in part without permission is prohibited.
 
- advert -
subscribe to Steel-Grips
LINKING STEEL SELLERS AND BUYERS IN THE MIDDLE EAST
steelgroup
custeel

no external All external sites will open in a new browser.
GRIPS media does not endorse external sites.