Carlyle Singh, Xavier Rabec, and Michel Dussud:
Mould level system upgrade at ArcelorMittal Dofasco´s No. 1 caster
Continuous casting, mould level, eddy-current sensor, actuator, stopper-rod mechanism
ArcelorMittal Dofasco installed a new mould level system in 2007. This discussion will describe the initial need and requirements, the benchmarking, the project itself with its innovations and the process of risk mitigation. In addition, the results of the commissioning, start-up and resulting performance improvements are reviewed.
In addition, make sure to read these articles:
Studies on the decarburization of commercial submerged entry nozzles
Studies on the decarburization of MgO-C refractories during ladle preheating
Characterisation and prereduction of electric arc furnace dust
New joint-venture launched for turnout production in Turkey
Mould level system upgrade at ArcelorMittal Dofasco´s No. 1 caster
Experience and results after three years of operation of a three-roll reducing and sizing block
Characterization of mould powders used in continuous casting
Lightweight construction by means of innovative process strategies in hydroforming technology
Prediction of strand superheat in continuous casting: modelling and industrial scale measurements in steelmaking tundish systems
Activity of ferrous oxide in complex slags containing V2O5
|
top of page
back
Tell a friend
print
read times
© 2009 GRIPS Intermedia GmbH All rights reserved. Reproduction in whole or in part without permission is prohibited.
|
|
All external sites will open in a new browser.
GRIPS media does not endorse external sites.
|
|