feedback
receive newsletter
login




STEEL GRIPS online
ISSN 1866-8453


Last updated:
________________
Feb 6, 2012
 
Homepage Steel-Grips 
Search STEEL GRIPS

         from P&S > Middle East  
Upgraded EAF started up at EZDK-Ezz Dikheila, Egypt
Dec 15, 2008
The existing 160-t EAF, revamped and upgraded by Danieli Centro Met with installation of the latest FastArc injection technology to improve the operational reliability and to increase its output to about 1.2 Mt/a, was started up successfully in August 2008.
 
Modification of the No. 1 EAF (located in the Alexandria meltshop, HR Flat Steel division), included the installation of new multi-point oxygen and carbon injectors, new shell with water-cooled panels and EBT design, and new Level 1 and 2 automation systems with dedicated PLC and HMI for automatic EAF process setting and control, and to interface with the existing ladle furnace and conticaster. The project also included the upgrading of the fume-treatment plant water-cooled duct.



In addition, make sure to read these articles:
read also Upgraded EAF started up at EZDK-Ezz Dikheila, Egypt

toptop of page   back back   send this news to a friend Tell a friend    printerfriendly page print   read read times  

© 2008 GRIPS Intermedia GmbH All rights reserved. Reproduction in whole or in part without permission is prohibited.
 
- advert -
subscribe to Steel-Grips
LINKING STEEL SELLERS AND BUYERS IN THE MIDDLE EAST
steelgroup
custeel

no external All external sites will open in a new browser.
GRIPS media does not endorse external sites.